Summer Developments
There are a number of improvements planned for the Grange Theatre this Summer.
These Include:
- Theatre Hire Office
- Control Room Improvements
- Audio Amplifier Rack Moved out of Control Room
- Audio Patch Bay Installed
- DMX Splitter Installed
- DMX Merger Installed
- Kramer Presentation Switcher Installed
- VGA Switcher Removed
- New Lectern
- Dedicated Stage Managers Console
- Increase in LED Lighting Stock
- Stage VGA Point Re-Installed
- Improved Storage throughout venue
There is a lot of work ahead ontop of the annual essential maintenance and PAT testing, but the Grange Theatre likes challenges and working together with Soundesign and in house staff we are looking forward to these improvements.